FeatureD Projects
Project Snapshot
Gemini is the nation's largest standalone solar PV and battery storage project. Located on Bureau of Land Management land in the northwestern portion of the Mojave Desert, Ojjo was chosen by Primergy Solar (Owner) and Kiewit Power (EPC) as the preferred foundation due to our ability to eliminate predrill and significantly reduce grading.
Project Snapshot
The Yellow Pine Solar Project is located on Bureau of Land Management land and showcases the Earth Truss system’s advantage in terrain where no grading is permitted. With more than four feet of reveal tolerance, a significant amount of topography was absorbed below each tracker row. This is the first phase of a three-phase project totaling over 525 MW dc.
Project Snapshot
Considered some of the toughest caliche soil in the country, the Eagle Shadow Mountain project greatly benefited from Ojjo’s proprietary technology that entirely eliminated predrill. Ojjo was honored to work closely with the Moapa Band of Paiutes to train several tribal members on truss installation.
Project Snapshot
The Titan and Aragorn Solar projects were installed in remote West Texas terrain known to require predrill and pile remediation. The Earth Truss system offered a torque-tube-ready installation experience, enabling reliable geometry paired with downstream labor savings.
Project Snapshot
Located in the high desert of Central Oregon, the Skysol Project required tackling extensive limestone and variable conditions.
Ojjo’s Earth Truss foundation provided precision installation in this otherwise 100% predrill scenario.